Bufftech Vinyl Fence

bufftech sale

Chesterfield CertaGrain with a S-Curve
By Bufftech (A Certainteed Company)

Chesterfield CertaGrain privacy fence with s-curve
Arctic Blend
Brazilian Blend
Sierra Blend
Weathered Blend

Chesterfield Features
  • Lifetime Transferable Warranty
  • Stylishly transition between two heights
  • Height: 6' transitions to 4'
  • Width: 8' Wide (Most competitors sections are 6')
  • CertaGrain texture
  • Tongue & Groove picket design
  • Aluminum top rail insert
  • Colors: Arctic Blend, Brazilian Blend, Sierra Blend, Weathered Blend
  • Good Neighbor fence looks great on both sides
  • Splinter free surface
  • ColorLast fade protection
  • No brackets, glue, or adhesive required

Brazilian Blend
Sierra Blend
Artic Blend

Weathered Blend


ColorLast Bufftech is the only fence manufacturer to offer ColorLast fade protection. This exclusive feature on our Clay color fence provides superior color retention and longer-lasting color when compared to competitive products.

SureStart Bufftech Chesterfield privacy fence is backed by outstanding lifetime limited warranty coverage, including our exclusive SureStart protection. SureStart covers warranted repair and replacement costs - including labor - for a period of five years after installation.

Lifetime Transferable Limited Warranty
CertainTeed warrants to the original homeowner/consumer that its Bufftech vinyl fence products will be free from manufacturing defects-including peeling, flaking, blistering and corroding-when subject to normal and proper use. The warranty transfers to the new homeowner, which now turns your fence into an asset.

Good Neighbor
Bufftech (Certainteed) privacy vinyl fence is designed with attractive appearance on both sides of the fence. Allowing your neighbors to enjoy your new fence, just as much as you do.


The Chesterfield CertaGrain privacy fence from Bufftech is now available with an S curve. This allows you to transition between a 6ft and a 4ft section without a suddon drop off in fence height. This vinyl fence also features Bufftechs CertaGrain texture, giving it the appearance and texture of wood while staying maintenance and splinter free. With it's good neighbor design, Chesterfield Certagrain is a fence your neighbors can enjoy as much as you.

Chesterfield Vinyl Fence

Contact Us

Shipping is available in the USA, Canada, Virgin Islands, & Mexico
To speak with a Customer Representative call today:


For additional information contact us:
Discount Fence Supply, Inc.
10050 Wellman Rd.
Streetsboro OH 44241
Phone: (800) 878-7829
Fax: (330) 650-9004
Email: Sales@DiscountFence.com