Bufftech Vinyl Fence
Leading Manufacturer of Vinyl Fencing - Lifetime Warranty
Traditional Vinyl Fence
Cape Cod
Cap Code Concave
Yorkshire
Yorkshire Concave
Charleston
Charleston Concave
Danbury
Danbury Concave
Classic Vinyl Fence
Normandy
Canterbury
Manchester
Manchester Concave
New Castle
New Castle with Midrail
Contemporary Vinyl Fence
Barron
Barron with Midrail
Countess
Countess with Midrail
Monarch
Monarch with Midrail
Princeton
Princeton with Midrail
Victorian
Victorian with Midrail
Semi-Private Vinyl Fence
Millbrook
Columbia
Columbia with Lattice
Imperial
Imperial with Latice
Privacy Vinyl Fence
Lexington
Lexington with Lattice
Lexington S Curve
Lexington Swoop
Galveston
Galveston with Lattice
CERTAGRAIN CHESTERFIELD
Chesterfield
Chesterfield with Lattice
Chesterfield with Victorian
Huntington
Norfolk
Norfolk with Lattice
Westminster
Post & Rail
Cross Buck
Two Rail
Three Rail
Four Rail
Certagrain Post and Rail
Vinyl Decking
Decking
Vinyl Deck Railing & Handrails
KINGSTON
OXFORD
Porch Post
Vinyl Fence Accessoires
Post Caps

Privacy Vinyl Fencing

Privacy vinyl fencing from Bufftech allows you to enjoy the benefits of a good neighbor fence; both sides of your vinyl fence look the same. Forget painting or staining. You'll enjoy the investment of your Poly vinyl fence for years to come. Bufftech takes privacy fence to a new level with new Classic Curve Deco Rail. Featuring the distinctive look of crown molding in a patent-pending design, Classic Curve delivers innovative styling that Bufftech is famous for in a choice of colors.


New Lexington Vinyl Fence
Lexington Privacy Vinyl Fence

Pricing
Description
Height
New Lexington
[ 4' ][ 6' ]
Click on the height for specified pricing

Drawings
Description
Height
New Lexington
[4'] [6']
Click on the height for pop up image
The New Lexington: Bufftech New Lexington is very similar to the chesterfield but provides a 5/8" picket to keep the cost down. The Lexington vinyl fence is also provides a tongue and groove picket to ensure privacy.


NewLexington with Lattice Accent

 

Pricing
Description
Height
Lexington with Lattice
[ 6' ]
Click on the height for specified pricing

Drawings
Description
Height
Lexington with Lattice
[6']
Click on the height for pop up image
The New Lexington with Lattice Accent: Bufftech Lexington with Lattice Accent is verysimilar to the chesterfield but provides a 5/8" picket to keep the cost down. The Lexington vinyl fence is also provides a tongue and groove picket to ensure privacy. Lexington with Lattice portrays a stunning accent to your privacy fence.

Lexington S Curve

 

Pricing
Description
Height
Lexington S Curve
[ 6']
Click on the height for specified pricing

Drawings
Description
Height
Lexington S Curve
[6']
Click on the height for pop up image
Lexington S Curve
The Lexington S Curve: Bufftech Lexington S Curve is very similar to the chesterfield but provides a 5/8" picket to keep the cost down. The Lexington vinyl fence is also provides a tongue and groove picket to ensure privacy. Lexington S Curve portrays a stunning accent to your privacy fence.


Lexington Swoop

 

Pricing
Description
Height
Lexington Swoop
[ 6']
Click on the height for specified pricing

Drawings
Description
Height
Lexington Swoop
[6']
Click on the height for pop up image
lexington Swoop
The Lexington Swoop: Bufftech Lexington Swoop is very similar to the chesterfield but provides a 5/8" picket to keep the cost down. The Lexington vinyl fence is also provides a tongue and groove picket to ensure privacy. Lexington with Lattice portrays a stunning accent to your privacy fence.


Chesterfield




Pricing
Description
Height
Chesterfield
[ 5'] [ 6']
Click on the height for specified pricing

Drawings
Description
Height
Chesterfield
[5'] [6']
Click on the height for pop up image
Why choose the Chesterfield With Bufftech engineering and development departments you can count on the best in vinyl fence. The Chesterfield vinyl fencing comes in three distinct styles: Regular, Lattice top and Victorian accent. This privacy fence comes with the tongue and grove feature on all styles, providing the strongest defense against wind and also provides the most privacy of all the privacy fencing in the industry. Not only that but the Chesterfield, Huntington and Westminister vinyl fence not only provides the 7/8 thick picket but also the new Deco Rail to add a touch of distinction to your top and bottom rail. For installation see Chesterfield Installation guide
 

Chesterfield with Lattice Accent

 

Pricing
Description
Height
Chesterfield with Lattice
[ 5' ] [ 6' ]
Click on the height for specified pricing

Drawings
Description
Height
Chesterfield with Lattice
[5'] [6']
Click on the height for pop up image

See an enlargement of the
Chesterfield with Lattice Accent
Why choose the Chesterfield With Bufftech engineering and development departments you can count on the best in vinyl fence. The Chesterfield vinyl fencing comes in three distinct styles: Regular, Lattice top and Victorian accent. This privacy fence comes with the tongue and grove feature on all styles, providing the strongest defense against wind and also provides the most privacy of all the privacy fencing in the industry. Not only that but the Chesterfield, Huntington and Westminister vinyl fence not only provides the 7/8 thick picket but also the new Deco Rail to add a touch of distinction to your top and bottom rail.

Chesterfield with Victorian Accent

Chesterfield with Victorian Accent

 

Pricing
Description
Height
Chesterfield with Victorian Accent
[ 6' ]
Click on the height for specified pricing

Drawings
Description
Height
Chesterfield with Victorian Accent
[6']
Click on the height for pop up image
Why choose the Chesterfield With Bufftech engineering and development departments you can count on the best in vinyl fence. The Chesterfield vinyl fencing comes in three distinct styles: Regular, Lattice top and Victorian accent. This privacy fence comes with the tongue and grove feature on all styles, providing the strongest defense against wind and also provides the most privacy of all the privacy fencing in the industry. Not only that but the Chesterfield, Huntington and Westminister vinyl fence not only provides the 7/8 thick picket but also the new Deco Rail to add a touch of distinction to your top and bottom rail.

Chesterfield with Huntington Accent
Huntington vinyl fence. when privacy and style are wanted

 

Pricing
Description
Height
Huntington
[ 6']
Click on the height for specified pricing

Drawings
Description
Height
Huntington
[6']
Click on the height for pop up image
The Chesterfield Huntington Accent: The Huntington isin a class by itself. The homeowner now has the option of a scalloped picket finished look to go along with the privacy and deco rail. Leave it to Bufftech Vinyl Fence Company to not be satisfied with the status quo but to constantly push for the best fence style.


Chesterfield with Westminster Accent

 

Pricing
Description
Height
Westminster
[ 6' ]
Click on the height for specified pricing

Drawings
Description
Height
Westminster
[6']
Click on the height for pop up image
Westminster vinyl privacy fence. when privacy and style are wanted
The Chesterfield Westminster Accent: Many of Bufftech's customer have asked for the look of a lattice top on their privacy vinyl fence and Bufftech heard their request and has come up with a lattice top in a class by itself. The homeowner now has the option of the Chesterfield, Huntington, and the Westminster Privacy Vinyl Fence.

Galveston

 

Pricing
Description
Height
Galveston
[7'] [8']
Galveston with Lattice
[8']
Galveston with Victorian Accent
[8']
Click on the height for specified pricing

Drawings
Description
Height
Galveston
[7'] [8']
Galveston with Lattice
[8']
Galveston with Victorian Accent
[8']
Click on the height for pop up image

 

Norfolk I(Discontinued)

 

Pricing
Description
Height
Norfolk I
Discontinued
Norfolk I with Lattice
Discontinued
Norfolk I with Victorian Accent
Discontinued
Click on the height for specified pricing
(Discontinued)
Drawings
Description
Height
Norfolk I
[5'] [6']
Norfolk I with Lattice
[6']
Norfolk I with Victorian Accent
[6']
Click on the height for pop up image

 

The Norfolk I Option: The vintage Norfolk I vinyl fence still uses the traditional 3" ribbed picket. Since the Norfolk I's pickets are not tongue and groove they provide a center support running horizontally the length of the fence section. The Norfolk I gives the option of a 4 foot high privacy fence that the Chesterfield at this time does not. It is evident that the mission of Bufftech vinyl fence is to provide the customer with the highest quality fencing in the vinyl fencing industry.
Shipping available within Continental USA

To Speak with a Customer Representative Call Today

1.800.878.7829

 

Vinyl Fence

vinyl fencing

Discount Fence Supply, Inc.

10050 Wellman Road
Streetsboro, OH 44241

Phone: 330-650-9226
Toll Free: 800-878-7829
Fax: 330-650-9004


Email Customer Support

Fence-it Home | Traditional | Classic | Contemporary | Semi-Private | Private | Post & Rail | Decking | Deck Railing | Post Caps